Marshall Institute (return to home) Marshall Institute - Maintenance Management Consulting & Training
919-834-3722 Contact Marshall Institute: 1-800-637-0120
Home  >  Consulting  >  Our Clients and Their Achievements    

Our Clients and Their Achievements


Aera Energy (2 Time Winner of the North American Maintenance Excellence (NAME) Award)
  • 40% Reduction in maintenance costs (1999-2002)
  • 25% Increase in injection reliability
  • 7% Increase in well on time reliability
Leggett & Platt
  • Maintenance budget reduction of USD 1M in the first 1.5 years
  • 6% productivity improvement in one facility
  • More than USD 740K reduction in operating cost (3 facilities)
  • Fixed 3178 previously unknown defects during ACW's workshop
Shell Oman (PDO)
  • One formal RCA event netted a USD 1.5M savings
  • Maintenance budget reduction of USD 3M in one year
  • Increased Mean Time Between Failure (MTBF) on a compressor unit from 56 days to 210 days and still counting
Shell Europe
  • Return on investment (ROI) is 10:1 over implementation costs
  • More than a 400% improvement in Mean Time Between Failure (MTBF)
  • Estimates that the ROI from TPM has been ten-fold their cost of implementation
Kaiser Aluminum
  • 22% reduction in maintenance budget
  • 17% reduction in manufacturing costs
  • 20% reduction in storeroom inventory
  • 40% reduction in maintenance overtime
MRC Bearings
  • Reduced unplanned downtime by 98% in one cell and 99% in another -all within one year
Energizer Battery
  • USD 1.5M reduction in maintenance labor cost
  • USD 750K reduction in material costs
  • 25% improvement in planned work
Whirlpool Appliances
  • 27% Improvement in productivity
  • $1.5 M reduction in maintenance costs in one year
Barriere Construction
  • Moved from 90% reactive to 15% reactive
  • MTBF increased by 91%
  • Cost per hour to operate equipment has decreased by 65%



 

Blog Posts

How PSM-NEP applies to non-chemical plants
Fri, 07 Jun 2013 20:30:00 GMT
The History and Purpose of PSM-NEP
Fri, 10 May 2013 05:29:00 GMT
PM Optimization as a Routine
Thu, 28 Mar 2013 19:52:00 GMT
     
 

e-Newsletter

TPM Video Series
7 Steps to BEC
Get LinkedIn
Be the Best
  

Social Media

Find us on Facebook!  Facebook
Find us on Twitter  Twitter
Find us on LinkedIn  LinkedIn
Find us on YouTube  YouTube
 
Privacy Policy
Copyright Marshall Institute
Home | About Us | Consulting | Maintenance Training | Products | Resources | Blog | Login v.2.9.1 [ 0.59 Sec ] [ 25 Ei ]